Managers on alert for “launch fever” as pressure builds for NASA’s Moon mission

KENNEDY SPACE CENTER, Florida—The rocket NASA is preparing to send four astronauts on a trip around the Moon will emerge from its assembly building on Florida’s Space Coast early Saturday for a slow crawl to its seaside launch pad.

Riding atop one of NASA’s diesel-powered crawler transporters, the Space Launch System rocket and its mobile launch platform will exit the Vehicle Assembly Building at Kennedy Space Center around 7:00 am EST (11:00 UTC). The massive tracked transporter, certified by Guinness as the world’s heaviest self-propelled vehicle, is expected to cover the four miles between the assembly building and Launch Complex 39B in about eight to 10 hours.

The rollout marks a major step for NASA’s Artemis II mission, the first human voyage to the vicinity of the Moon since the last Apollo lunar landing in December 1972. Artemis II will not land. Instead, a crew of four astronauts will travel around the far side of the Moon at a distance of several thousand miles, setting the record for the farthest humans have ever ventured from Earth.

Read full article

Comments